Project Name | Owner | Project Output | Period |
---|---|---|---|
SMP (Steel Structure/ Mechanical/Piping) Work of WP3 area BTX-LINE PJT | LOTTE CHEMICAL INDONESIA | Piping | 2023 |
Perbaikan Pipa Utility Mekanikal dan Elektrikal dan Perbaikan Installasi Power Listrik Percetakan-Unit XI PT.GG Kediri | Gudang Garam Tbk, PT | Mechanical | 2023 |
Jasa Replacement Tyre 3 Kiln 443KL1 Tuban III (PR.6100007741) | Semen Indonesia, PT | Mechanical | 2023 |
Mechanical Piping of UOI Indonesia 1xPHG830+2xPSA64-SOG project | Air Products Indonesia, PT | Piping | 2023 |
Mechanical Works Pakckaged ME3-2 OSBL Tanks - 13 Units | RDMP Balikpapan JO / Hyundai EC | Tank | 2022 |
Electrical Work Centralized Workshop PT MNA Serang | MULTIMAS NABATI ASAHAN, PT | Electrical | 2022 |
Jasa Replacement Tyre 2 Kiln 442KL1 Tuban II | PT Semen Indonesia | Mechanical | 2022 |
Steel Structure, Mechanical & Piping Erection Work -EPCC Ausmelt Project | PT. Wijaya Karya | Steel Structure | 2021 |
Penggantian (Replacement) Piping Carbon Steel di Area HCC | PT JGC Indonesia | Piping | 2021 |
Pekerjaan General Mechanical Work Package 2 (Process Area 2 and Offsite Area) JTB Project | PT Rekayasa Industri | Mechanical | 2020 |
MEP Work Build C/D/G Warehouse Buildings Refurbishment in Mechanical Electrical Plumbing Construction | PT Karyadibya Mahardhika | Civil | 2020 |
Piping Process Area for Batik Sugar Mill & Power Plant Project | PT Muria Sumba Manis | Piping | 2020 |
Combine General civil, Concrete Work & Building Area H-200 And Building Work Area H-100 & H-300 JTB Project | PT JGC Indonesia | Civil | 2019 |
Struktur, Arsitektur & MEP Proyek Depo Rokok Gudang Garam Lubuk Linggau Sumatera Selatan | PT. Gudang Garam,Tbk. | Civil | 2019 |
Civil Works of Requisition for Preparation Road, Capping Work and Slope Protection (Supply and Install Limestone) JTB Project | PT Rekayasa Industri | Civil | 2019 |
Supply, Fabrication & Installation of Steel Structure Package 2 JTB Project | PT Rekayasa Industri | Steel Structure | 2019 |
General Civil Non Tank Foundation Jakarta Tank Terminal Phase 2A Project | PT Tripatra | Civil | 2019 |
Pekerjaan Renovasi GG Tegal | PT Gudang Garam Tbk. | Civil | 2019 |
Instalation Mechanical & Piping Package # 1 & Package #3 East Halmahera Ferronikel Plant Project | PT Wijaya Karya | Piping | 2018 |
Amandemen 3 Instalation Mechanical & Piping Package # 1 & Package #3 East Halmahera Ferronikel Plant Project | PT Wijaya Karya | Mechanical | 2018 |
Boiler Buckstay For Unit #5 Tanjung Jati B 1000 MW Projec | PT MH Power System Indonesia | Mechanical | 2018 |
Boiler Buckstay For Unit #6 Tanjung Jati B 1000 MW Project | PT MH Power System Indonesia | Mechanical | 2018 |
Pekerjaan Struktur Arsitektur & MEP Depo Rokok Gudang Garam Tbk Magelang | PT. Gudang Garam,Tbk. | Civil | 2018 |
Supply & Fabrication Duct Panel Jawa 9 & 10 2x1.000 MW Coal Fired Steam Power Plant Praject | PT MH Power System Indonesia | Others | 2018 |
Pekerjaan Tambah Daya Tahap 2 Electrical Work | PT Indofood Sukses Makmur | Electrical | 2018 |
Site Preparation Work in GPF Area Gas DeVelopment Project For The Unitization of JTB Field Project | PT Rekayasa Industri | Civil | 2018 |
Palembang Cement Terminal Paket #1, #2, #3 (Paket B) | PT Holcim Indonesia | Mechanical | 2018 |
Installation Electrical & Instrument Work East Halmahera Ferronickel Plant Project | PT Wijaya Karya | Instrument | 2018 |
Perencanaan Soil Improvement Jalan & Drainase di Area Blok H Stage (1) | PT Berkah Kawasan Manyar Sejahtera | Civil | 2018 |
Road Geometry Pakujuang Mill to Kelampai Jetty via Eagle High Plantation | PT Cargill Indonesia | Civil | 2018 |
Boiler Buckstay For Unit #5 Cirebon 21.000 MW Project | PT MH Power System Indonesia | Mechanical | 2018 |
Process Area Piping Work Block A Gas Development Project Aceh | PT Encona Inti Industri | Piping | 2017 |
Manufacturing of Welded Product -Proyek Pembangunan Pabrik Peronikel Halmahera Timur (P3FH) East Halmahera Feronickel Plant Project | Kawasaki Heavy Industries Ltd. | Others | 2017 |
HRSG Casing, Inlet Duct, Columns & Beams Fabrication 170800 Muara Tawar | PT. Nooter Eriksen S.r.l | Others | 2017 |
Exhaust Stack Fabrication 170800 Muara Tawar | PT. Nooter Eriksen S.r.l | Others | 2017 |
Steel Structure Erection Work Package Suban Compression Project | PT Inti Karya Persada Teknik | Steel Structure | 2017 |
Boiler Buckstay For Unit #5 Cirebon 21.000 MW Project | PT MH Power System Indonesia | Mechanical | 2017 |
Aboveground Piping & Painting Work Package 1 Suban Compression Project | PT Inti Karya Persada Teknik | Piping | 2017 |
Supply Fabrication ESP Platform & Stairway Tanjung Jati B 1000 MW x 2 Units | PT MH Power System Indonesia | Steel Structure | 2017 |
Fabrkasi & Erection Steeel Structure PLTU Muara Tawar | PT Hutama Karya | Steel Structure | 2017 |