• Swadaya Logo 1
  • Swadaya Logo 2
  • Swadaya Logo 3
  • Swadaya Logo 4
  • Swadaya Logo 5
  • Swadaya Logo 6
  • Swadaya Logo 7

On Going Projects

General Civil Works & Building
 •  Pembangunan Pondasi, Support, Gallery Conveyor, Transfer Tower Supply, Fabrikasi & Pemasangan Belt Conveyor c/w Acc. Fasilitas Feeding Bahan Bakar Alternatif Fuel Tuban I - Paket 2, PT Semen Gresik Tbk, 201
 •  Pembangunan Sekam Storage, Slabing, Supply, Fabrikasi & Pemasangan Hopper, Pin Gate Fasilitas Feeding Bahan Bakar Alternatif Fuel Tuban I - Paket 1, PT Semen Gresik Tbk, 201
 •  Gorong-Gorong Saluran Kaliwatu Area Cement Silo & Cement Packer Tuban IV, PT Semen Gresik Tbk, 201
 •  General Civil for Power Plant Tonasa, PT Rekayasa Industri, 2011
 •  Pile Cap & Struktur Atas Silo Cement Pelabuhan, PT Semen Tonasa, 2011
 • 
Srtuktur Beton Fasilitas Clinker Reject Bin, PT Semen Gresik Tbk, 2011 
 •  Fabrication & Erection Steel Structure, Architectural Raw Grinding, PT Semen Gresik Tbk, 2011 
 •  Gallery & Hopper Facilities Auxiliary Raw Material Tuban I & II, PT Semen Gresik Tbk, 2011 
 •  Construction of Cigarrete Depot Kreongan - Jember, PT Gudang Garam Tbk, 2011 
 •  Printing Building Unit XI, PT Gudang Garam Tbk, 2011
 •  Pile Cap & Structure Atas Bangunan Main Substation Tonasa V Package C1201-3, PT Semen Tonasa, 2010 - 2011 
 •  Pembangunan Dermaga Packing Plant - Banyuwangi, PT Semen Gresik, 2010 - 2011
 •  Bored Pile Limestone Crusher, Surge Bin, Gallery Transport from Limestone Crusher to Surge Bin and Long Belt Conveyor Tuban IV, PT Semen Gresik Tbk, 2010 - 2011
 •  Digester Carbon Brick Linning - Petrokimia, PT Multinas Indonesia - 2011
 • 
Pondasi , Struktur Beton, Ereksi Baja, Arsitekural Fasilitas Cement Mill & Gypsum Crusher Tuban IV, PT Semen Gresik Tbk, 2010-2011   
 •  Pondasi & Struktur Beton, Ereksi Baja & Arsitektural untuk Preheater, Rotary Kiln dan EP Cooler, PT Semen Gresik Tbk, 2010-2011 
 • 
General Civil Work MNK-2 Cikampek Project, PT IKPT, 2010 - 2011

Steel Fabrication
 •  Fabrication & Erection for Pipe Ducting Support Clinker Cooler to Cement Mill TB-IV, PT Semen Gresik Tbk, 2011
 •  Fabrikasi & Ereksi Baja, Arsitektural untuk Preheater Kiln Feed Tuban IV, PT Semen Gresik Tbk, 2011
 •  Shipping Frame - Power Plant Eemshaven, PT Alstom Power ESI, 2011
 •  Fabrication SteelStructureTransport Phase 3, Kiln of Standart, Clinker Silo & Frame Phase 3, PT Semen Gresik Tbk, 2011 
 •  EPC Clinker Transport Conveyor from TB-II to TB-IV, PT Semen Gresik Tbk, 2011 
 •  Pondasi Struktur Beton, Fabrikasi & Ereksi Baja, Arsitektural Gallery Aeroslide untuk Cement Transport for Cement Mill to Cement Silo, Cement Transport from Cement Silo to Cement Packer Tuban IV, PT Semen Gresik Tbk, 2010 - 2011
 •  Fabrication 2B - Bag Filter, Cement Mill Filter Fan, Bag Filter Cement Mill Package B Tuban IV, PT Semen Gresik Tbk, 2010 - 2011
 • 
Fabrication Work for Roof Casing & Shipping Fixture of North Battle Project, PT Alstom Power ESI, 2010 - 2011
 
Mechanical & Installation
 • Unloading Equipment FA Ex Ecoereen & Install/Erection Spliting Coloumb, PT Wilmar Nabati Indonesia, 2011
 • Isntallation Insulation for Mechanical Construction M2A-3A Proyek Tuban IV, PT Semen Gresik Tbk, 2011
 • Pengecatan Ulang Mesin, PT Gudang Garam Tbk, 2011
 • Rekondisi Clinker Cooler 443CC1 (Over Haul), Semen Gresik Tbk, 2011
 • Fabrikasi Conveyor Frame, Cover, Shim Plate, Dicharge Chute, Skirt Board untuk Long Belt Conveyor  (Paket 2), Semen Gresik Tbk, 2011
 • Fabrikasi Conveyor Frame, Cover, Shim Plate, Dicharge Chute, Skirt Board untuk Long Belt Conveyor  (Paket 1), Semen Gresik Tbk, 2011
 • Lock & Stitching Tire Kiln Tuban I, Semen Gresik Tbk, 2011
 • Site Erection & Commissioning of Replacement Stacker Reclaimer No. 1 - Paiton Private Power Plant Phase I, Paiton Energy, 2011
 • KPI Ammonia Pipe Line Work, Kaltim Parna Industri, 2011
 • Insulation for Package 2B PIV-5B-M9-PM-002-K, PT Semen Gresik Tbk, 2011 
 • Demilition, Supply, Fabricationi & Installation MFR/ABC Inlet Cooler TB-III, PT Semen Gresik Tbk, 2011 
 • Electrical & Instrument Installlation of ID Fan 2 & ABC Inlet Tuban III, PT Semen Gresik Tbk, 2011 
 • Material Procurement of KPI Ammonia Project Tie-In System, PT Kaltim Nitrate Indonesia, 2011 
 • Erection Structure Exhaust Gas Conditioning & Coal Crusher Tonasa V (Package C1202-5 & P1202-7), PT Semen Tonasa, 2010 - 2011  
 • Erection Steel Structure Cement Mill Feed, Clinker Cooler & Clinker Storage Tonasa V Package C1202-4, C1202-8 & C1202-9, PT Semen Tonasa, 2010 - 2011
 •  Erection Structure Raw Mill, Raw Feed Bin & Coal Mill, Limestone Crusher Tonasa V Package C1202-6, C1202-7 & C1202-5, PT Semen Tonasa, 2010 - 2011
 • Foundation Concrete Structure, Fab & Erection Steel Structure, Architectural Gallery Aeroslide for Cement Transport for Cement Mill to Cement Silo, Cement Transport from Cement Silo to Cement Packer Tuban IV, PT Semen Gresik Tbk, 2011 
 • Mechanical Construction Package M2A-5 Tuban IV, PT Semen Gresik Tbk, 2010 - 2011
 • Mechanical Construction Package M2A-1 Raw Mill Paket E - Tuban IV, PT Semen Gresik Tbk, 2010 - 2011
 • Erection Equipment Crusher (Clay, Limestone, Silica, Coal) Equipment Raw Mill, Coal Mill & Pyroprocess Tonasa V (Package C2101, C2102 & C2103), PT Semen Tonasa, 2010 - 2011
 • Mechanical Fabrication & Construction of Bridge Reclaimer, Portal Reclaimer, Traffeling Tripper for Limestone Storage, PT Semen Gresik Tbk, 2010 - 2011
 • Mechanical Construction Package M2A-2 & Ereksi Baja Struktur Beton Atas, Arsitektur untuk Preheater (Preheater Facility Paket 4), PT Semen Gresik Tbk, 2010 - 2011
 • Package E - Requistion for Mechanical Construction Package M2B-1, PT Semen Gresik Tbk, 2010 - 2011 

Electrical & Instrument
 • Jaringan Listrik Package E2B3 (Finis Mill, Packer dan Substation XIV) Tuban IV, PT Semen Gresik Tbk, 2011
 • Paket D - Pengadaan & Pemasangan Peralatan Listrik & Control WTP TB-IV, PT Semen Gresik Tbk, 2010 - 2011 
 • Electrical & Instrument for Cement Packer Area Packing Plant Tuban IV, PT Semen Gresik Tbk, 2010  - 2011