Project Name Client / Owner Project Output Period
Installation Control Valve 52 Unit - Kaltim 5 Project PT Inti Karya Persada Teknik Equipment Installation 2014
Pengadaan Pemasangan Material Proyek Steam Line Semi Direct Blend Unit V PT Gudang Garam Tbk Installation Work 2014
Instalasi Piping Chiller Water System PH 2 Pandaan PT Karya Dibya Mahardhika Piping Work 2014
Pemasangan Chiller Water Line AHU Dapur Saos PT Karya Dibya Mahardhika Installation Work 2014
Electrical Installation Work - Ammonia Tank Cap. 20.000 MT Double Wall PT Rekayasa Industri / PT Petrokimia Gresik Electrical Work 2014
Pengadaan & Pemasangan Line Pipa Compressor dari Jalur Induk ke Mesin Semi Direct Blend Unit V PT Gudang Garam Tbk. Piping Work 2014
Pekerjaan Piping Installation Works Area CPP2 & Jetty Senoro Gas Development Project PT Tripatra Piping Work 2014
Onsite Piping Works Utility and Process Piping Banyu Urip Project EPC- PT Tripatra Piping Work 2014
Pengadaan & Pemasangan Steam Line Piping & Condensate Line Piping Lokasi New ABL Unit 5 PT Gudang Garam Tbk. Piping Work 2014
Pemasangan Pipa AHU 4.5.8.9.12.13 PHE filter Maker 90/14.80 Airinotec & Instalasi Piping Softener Pentair Type 2906 & Sand Filter EPD Cooling Type 138 do Phase 2 & 2 PT Gudang Garam Tbk. Piping Work 2014