Project Name | Client / Owner | Project Output | Period |
Supply, Fabrikasi, Erection Modifikasi Clinker Cooler Tuban 2 | PT Semen Indonesia | Fabrication Work | 2014-2015 |
Fabrication Blade Frame & Cover for 8404 | Baltec Inlet & Exhaust System | Plate Work | 2014 |
Pemasangan Ducting Hot Gas Cooler ke Finish Mill Pabrik Tuban I | PT Semen Indonesia | Installation Work | 2014 |
Supply & Mfg Feed Trunnion Linner | PT Metso Mineral Indonesia | Plate Work | 2014 |
Replacing Shell Dia 5600 x 19250 mm LG Kiln Tuban II | PT Semen Indonesia | Installation Work | 2014 |
Supply & Fabrication Work Chute & Hopper of Revamping Project | Wuhuan Engineering Co. Ltd. / PT Petrokima Gresik | Plate Work | 2014 |
Supply & Fabrication Embedded Pipe for Effluent Treatment (TKD-6631/D-6653) Revamp of Phosphoric Acid Plant Project | Wuhuan Engineering Co. Ltd. | Fabrication Work | 2014 |
Steel Structure Fabrication & Erection Works | Wuhuan Engineering Co. Ltd. / PT Petrokima Gresik | Steel Structure Work | 2014 |
DBC-TS-KXXER-C01034-Shelter Erection Work Bayu Urip Project | PT. Tripatra | Mechanical & Erection Work | 2014 |
Coal Unloading System Paket 2 Proyek Semen Tonasa IV | PT Semen Tonasa | Coal Unloading System | 2014 |
01 Jul 2020
Piping Process Area for Batik Sugar Mill & Power Plant ProjectPT Muria Sumba Manis